Project overview
Construction site: Bugao Avenue, Chang'an, Dongguan
Construction area: 5500m2 * 3 floors
Contracting scope:
1、 1 / 2 / 3F plant decoration works (including color steel plate partition wall, brick partition wall and explosion-proof wall masonry; color steel plate ceiling, gypsum board ceiling, aluminum gusset plate ceiling, anti-static PVC floor, environmental self flow floor, etc.);
2、 HVAC project of 1F 10000 class constant temperature and humidity dust-free workshop (MAU + FFU + DDC system) Electromechanical HVAC engineering of 2 / 3F ordinary constant temperature and humidity workshop
3、 1 / 2 / 3F air compression pipeline works
4、 1 / 2 / 3F water supply and drainage works
5、 1 / 2 / 3F lightning protection and grounding works
6、 1 / 2 / 3F smoke control and exhaust works
7、 1 / 2 / 3F process production power distribution, lighting power distribution and air conditioning power distribution works
8、 2000rt air conditioning main engine room project

Tel: 400-7885-205
Add: Room 201, No. 9, Zhenlong Road, Chang'an Town, Dongguan City, Guangdong Province
Copyright? 2021 Dongguan Haicheng Yonghe air conditioning purification technology Co., Ltd On record
Copyright? 2021 Dongguan Haicheng Yonghe air conditioning purification technology Co., Ltd