Project overview
Construction site: Dongguan Liaobu GAODA Industrial Park
Construction area: 3000㎡ * 3 floors
Contracting scope:
1、 1F 1000, 2f 10 and 4f 10000 dust-free workshop decoration works (including color steel plate partition wall and brick partition wall; color steel plate ceiling, gypsum board ceiling, aluminum gusset plate ceiling, anti-static PVC floor, environmental self flow floor, elevated floor, etc.);
2、 HVAC works of 1 / 2 / 4f constant temperature, humidity and dust-free workshop (MAU + FFU + DDC system)
3、 1 / 2 / 4f air compression pipeline works
4、 1 / 2 / 3 nitrogen pipeline works
5、 Anti static grounding works 4f / 2
6、 1 / 2 / 4f process production power distribution, lighting power distribution and air conditioning power distribution works
7、 Roof 1000rt air conditioning main engine room project

Tel: 400-7885-205
Add: Room 201, No. 9, Zhenlong Road, Chang'an Town, Dongguan City, Guangdong Province
Copyright? 2021 Dongguan Haicheng Yonghe air conditioning purification technology Co., Ltd On record
Copyright? 2021 Dongguan Haicheng Yonghe air conditioning purification technology Co., Ltd