Project overview
Construction site: New Delhi, India
Construction area: 10000m2 * 2 floors * 3 buildings
Contracting scope:
1、 Decoration works of SMT 10000 dust-free workshop on the first floor of F3, decoration works of assembly workshop on the first and second floors of F1 / F2 and F3 (including color steel plate partition wall, color steel plate ceiling and anti-static PVC floor);
2、 F1 / F2 first and second floor, F3 second floor assembly workshop (AHU air conditioning system), HVAC works of SMT 10000 dust-free workshop on the second, third and fourth floor of Building 1 and F3 first floor (MAU + FFU + DDC system)
3、 F1 / F2 first and second floor, F3 second floor assembly workshop (AHU air conditioning system), one building second, third and fourth floor, F3 first floor SMT 10000 dust-free workshop air compression pipeline project
4、 F1 / F2 first and second floor, F3 second floor assembly workshop (AHU air conditioning system), 234Th floor of Building 1, and anti-static grounding works of SMT 10000 dust-free workshop on F3 first floor
5、 F1 / F2 first and second floor, F3 second floor assembly workshop (AHU air conditioning system), 234Th floor of Building 1, SMT 10000 dust-free workshop on F3 first floor, workshop lighting power distribution and air conditioning power distribution works

Tel: 400-7885-205
Add: Room 201, No. 9, Zhenlong Road, Chang'an Town, Dongguan City, Guangdong Province
Copyright? 2021 Dongguan Haicheng Yonghe air conditioning purification technology Co., Ltd On record
Copyright? 2021 Dongguan Haicheng Yonghe air conditioning purification technology Co., Ltd